1. Suitable for producing different kinds of pallet.
2. Optional bottom sealing,product eject,core-pulling movement elements.
3. Adopt high output extrusion system,accumulating die head.
4. Hydraulic Servo control system.
Hydraulic system as a part of mechanical and electrical integration, which is achieving automation, providing the labor production efficiency, reducing production costs, and playing a decisive role in the modern industrial production. JWELL company has the professional hydraulic design team, who has been committed to the design and manufacturing adopting the advanced concept, also has achieved product diversification, standardization and mature technology to create a good economic benefits for customers.
1. Crusher and shredder of plastic recycling machine;
2. Chemical fiber component,30T and 50T hydraulic station;
3. Three roller calendar, calibration table of sheet and plate machine;
4. Cutter, vacuum tank and haul off of pipe machine;
5. Corrugator of corrugated pipe machine;
6. Blow molding machine;
Model |
Unit |
BM500 |
BM1000 |
Max product volume |
L |
500 |
1000 |
Dry cycle |
Pc/h |
250 |
155 |
Die head structure |
Accumulating type |
||
Main screw diameter |
mm |
100*2 |
120*2 |
Max plasticizing capacity (PE) |
kg/h |
400 |
700 |
Driving motor |
Kw |
90*2 |
132*2 |
Accumulating volume |
L |
40 |
60 |
Oil pump motor power |
Kw |
40 |
55 |
Clamping force |
KN |
1300 |
1800 |
Space between platen |
mm |
950-2000 |
1000-2700 |
Platen size W*H |
mm |
1400*1800 |
1900*2300 |
Max.mould size |
mm |
1200*1920 |
1750*2200 |
Heating power of die head |
Kw |
50 |
65 |
Machine dimension L*W*H |
m |
10.4*8.2*6.5 |
14*12*8.5 |
Machine weight |
T |
45 |
70 |
Total power |
Kw |
325 |
460 |
Note: Informations listed above are for reference only, the production line can be designed by customer’s requirements. |
Q1: I don’t know which one is suitable for me?
A:Please tell me
1)Your materials(For example: PP,PE, PS, ABS, PET, PC etc.)
2)What field (or industry) are your products used in?
3)The width(mm)of your product.
4)The thickness(mm)of your product.
5)The output(kg/h)you need.
Q2:How long is the delivery date?
A:The normal delivery time of the production line is 3-4 months, and that of special customization is 4-6 months.
Q3:What is the payment terms?
A:T/T,L/C,Cash and so on.
Q4:How about warranty?
A:In condition that Buyer follows regulations of product preservation and usage, the Seller agree to warranty of 12 months from the date of equipment installation, or 18 months after delivery, whichever comes first.
Q5:Do you have CE document and other document for customs clearance?
A:Yes,we have original.At first we will show you and after shipment we will give you CE/Packing list/Commercial Invoice/sales contract for customs clearance.
Q6:I don’t know how to use after I receive or I have problem during use,how to do?
A:1)After the goods arrive at your factory, contact us to arrange engineers to serve in your factory.Commissioning service includes supervision of installation and start-up, on-site training. The Buyer should offer the transportation, accommodation and food for the engineer(s) of the Seller within the territory of the Buyer’s country. Service charges are free.
2)If have any problem during use,you need our technician to judge the problem elsewhere will be solved by us. We can provide team viewer/WhatsApp/WeChat/Email/Phone with cam till all of your problems finished.We can also provide Door service if you need.