PP thick plate extrusion line
PP thick plate, It is an environment-friendly product and is widely applied in chemistry industry, food industry, anti-erosion industry, environmentally-friendly equipments industry, etc. PP thick plate extrusion line of 2000mm width is a newly developed line which is the most advanced and stable line compared with other competitors.
PE thick plate extrusion line
PE plate is widely applied in chemical and electric power industries. HDPE plate, known as engineering plastics, is used in mechanical and chemical equipments as well as ice hockey ring walls.
PVC thick plate extrusion line
Rigid PVC thick plate is widely used in chemical industry, petrol, electroplating, water purifying equipments, environment-friendly equipments, lamp house and advertisements, etc.
PVDF plate extrusion line
PVDF plate is a pure plate extruded with Polyvinylidene fluoride resin, there is no any additive (such as UV stabilizer, heat stabilizer, plasticizer, lubricant or flame retardant etc.). The plate was widely used in petrifaction, electricity, metallurgy, paper making, spinning, medicine and atomic energy industry and other industries, especially, for the application of conveying the pure chemical agent used in cleaning water system and semiconductor industry.
Suitable material |
PP,PE,ABS,PVDF |
PP,PE,ABS |
PP |
PVC |
Model |
JW120/65-1600 |
JW170/90-2100 |
JW180/180-3000 |
SJZ80/156-1500 |
Products thickness |
3-30mm |
3-30mm |
3-30mm |
3-30 |
Products width |
1500mm |
2000mm |
3000mm |
1220mm |
Capacity |
400kg/h |
700kg/h |
1800kg/h |
400kg/h |
Note: The specifications are subject to change without prior notice.
Q1: I don’t know which one is suitable for me?
A:Please tell me
1)Your materials(For example: PP,PE, PS, ABS, PET, PC etc.)
2)What field (or industry) are your products used in?
3)The width(mm)of your product.
4)The thickness(mm)of your product.
5)The output(kg/h)you need.
Q2:How long is the delivery date?
A:The normal delivery time of the production line is 3-4 months, and that of special customization is 4-6 months.
Q3:What is the payment terms?
A:T/T,L/C,Cash and so on.
Q4:How about warranty?
A:In condition that Buyer follows regulations of product preservation and usage, the Seller agree to warranty of 12 months from the date of equipment installation, or 18 months after delivery, whichever comes first.
Q5:Do you have CE document and other document for customs clearance?
A:Yes,we have original.At first we will show you and after shipment we will give you CE/Packing list/Commercial Invoice/sales contract for customs clearance.
Q6:I don’t know how to use after I receive or I have problem during use,how to do?
A:1)After the goods arrive at your factory, contact us to arrange engineers to serve in your factory.Commissioning service includes supervision of installation and start-up, on-site training. The Buyer should offer the transportation, accommodation and food for the engineer(s) of the Seller within the territory of the Buyer’s country. Service charges are free.
2)If have any problem during use,you need our technician to judge the problem elsewhere will be solved by us. We can provide team viewer/WhatsApp/WeChat/Email/Phone with cam till all of your problems finished.We can also provide Door service if you need.