Casting Film Roller

Short Description:

JWELL manufactured casting film roller strictly according to European professional manufacturing standards. Several steps of welding and heat treatment process are applied to give ensurance to the overall rigidity and reliability of roller structure.


Product Detail

FAQ

Production bases

Product Tags

In order to ensure its efficient heat exchange, casting roller flow channel are designed with the special spiral, and through accurate calculation of the coolant flow, the roller surface temperature deviation are reduced to the least possible. It improves the temperature uniformity of the product.

The most important is the precision of dynamic balancing of roller.Specialized large dynamic balance calibration equipment and a variety of balance detection scheme, ensures smooth operation at high rotation speed.

Features

● Roller diameter: max. 1600 mm
● Roller cylindricity, concentricity both ≤0.005mm
● Roller surface hard chromium plated, coating thickness is 50 ~ 80 um
● Roller surface temperature deviation ±0.5~1℃
● Roller surface treatment: mirror polished, super finishing mirror, matt, mist and anti adhesive surface
● Speed: max. 800 m/min
● Overall deformation: < 0.05 mm at full load
● Best dynamic balance: Q = 3.2

Display of finished products

Casting Film Roller1
Casting Film Roller6
Casting Film Roller5
Casting Film Roller4
Casting Film Roller3
Casting Film Roller2

  • Previous:
  • Next:

  • Q1: I don’t know which one is suitable for me?

    A:Please tell me

    1)Your materialsFor example: PP,PE, PS, ABS, PET, PC etc.

    2)What field (or industry) are your products used in?

    3)The width(mm)of your product.

    4)The thickness(mm)of your product.

    5)The output(kg/h)you need.

    Q2:How long is the delivery date

    A:The normal delivery time of the production line is 3-4 months, and that of special customization is 4-6 months.

    Q3:What is the payment terms?

    A:T/T,L/C,Cash and so on.

    Q4:How about warranty?

    A:In condition that Buyer follows regulations of product preservation and usage, the Seller agree to warranty of 12 months from the date of equipment installation, or 18 months after delivery, whichever comes first.

    Q5Do you have CE document and other document for customs clearance?

    A:Yes,we have original.At first we will show you and after shipment we will give you CE/Packing list/Commercial Invoice/sales contract for customs clearance.

    Q6:I don’t know how to use after I receive or I have problem during use,how to do?

    A:1)After the goods arrive at your factory, contact us to arrange engineers to serve in your factory.Commissioning service includes supervision of installation and start-up, on-site training. The Buyer should offer the transportation, accommodation and food for the engineer(s) of the Seller within the territory of the Buyer’s country. Service charges are free.

    2)If have any problem during use,you need our technician to judge the problem elsewhere will be solved by us. We can provide team viewer/WhatsApp/WeChat/Email/Phone with cam till all of your problems finished.We can also provide Door service if you need.

    通用资料_01

    Write your message here and send it to us